Sarawak-based oil and gas fabricator Brooke Dockyard and Engineering has been awarded a significant contract to build wellhead platforms for the Bokor phase three re-development project. .
Brooke will provide front-end engineering and design services plus the engineering, procurement, construction, installation and commissioning of three wellhead platforms, said project operator Petronas.
The three wellhead platforms will be installed at the Bokor field, about 45 kilometres north-west of Lutong, Miri.
The project is part of the Baram Delta Enhanced Oil Recovery production sharing contract owned jointly by operator Petronas on behalf of joint venture partner Shell.
Brooke is wholly owned by the Sarawak state government.
Malaysia Marine and Heavy Engineering was awarded a contract earlier this month for the Bokor phase three central processing platform.