Saturday, 21 May 2011

200 protest Lynas plant at Australian embassy

Protesters march from KLCC after Friday prayers to hand a memo to the embassy against the plant Protesters converged on the Australian high commission today as opponents of the on-going Lynas Advanced Material Plant (Lamp) project pile on the pressure against having a rare earth processing plant in Gebeng, Pahang.

NONEThis is the second such protest held in Kuala Lumpur since the first- held during the last Parliament meeting in March - barely two weeks before an international expert panel will spend six days here to scrutinise the project's safety aspects.

Some 200 people, made up of Kuantan residents, NGO representatives and members of PAS and PKR youth wings, gathered on the road some 50m from the high commission building just after Friday prayers at about 2pm, forming a tight group as around 100 police officers kept a watchful eye.

NONEFRU officers formed human barriers at the junction turning into Jalan Yap Kwan Seng, where the high commission office is located, but otherwise allowed the protesters to go about their business.

With chants of “Stop Lynas!” and “Kami bukan tikus makmal! (We are not lab rats!)”, the protesters cheered on a delegation of six as they went in to the high commission to present a memorandum on the Lynas controversy to the Australian government.

The memorandum, addressed to the Australian high commissioner to Malaysia, urged the Australian government to do all it can to make sure Malaysians are safe from the threat of potential radiation poisoning.

“We are not convinced by the assurances of Lamp, (and others allied to their cause), that the Lamp is safe. If it truly were so, surely then your country should readily keep that industry within its borders, or at the very least be prepared to take back the waste (which contains the deadly thorium).

“But your country has flatly refused to take back their own waste,” the memorandum read.

No guarantee of safety

Save Malaysia, Stop Lynas committee spokesperson Vincent Jiam, who was in the delegation, later said that the residents in Kuantan - just 20 minutes from Gebeng where the plant is being built - are outright opposed to the project.

NONE“On moral grounds, Lynas is taking advantage of our outdated environmental law. Because of the loophole in the law, it is easy for Lynas to bring in the ore from other places.

“We cannot control it... the ore will come not only from Australia by that time (the plant is operational). Who can stand there, count and check every packet (of ore)?

“We don't want the industry to start at all, regardless of whether it is safe or not safe. We don't want it because there is no guarantee (of safety),” he said, adding that they give Lynas till Aug 31 to pack up and leave.

Rare earth industry 'disastrous'

Kuantan MP Fuziah Salleh echoed Jiam's concerns, questioning the moral fibre of Lynas' leadership in exploiting Malaysia's lax environmental protection.

“This industry is associated with much disaster. Nobody in the world wants to have it. Lynas said they got a licence in Australia, but why don't they do it there?

“I studied the matter and found that the requirements were too strict... in Australia you cannot have residents anywhere close-by. In Gebeng, you have 700,000 residents in a 35km radius (around the plant),” said Fuziah, who was also in the delegation.

The Lynas rare earth plant is expected to be completed by this September, despite facing public outrage over claims that its operations will produce radioactive waste that are potentially harmful to the public.

The Australian mining company and the Malaysian government have repeatedly assured that the plant will be safe and will not be a public hazard.

Growing public anger over the project however forced the government to moot the formation of an international expert panel formed by the International Atomic Energy Agency, which is expected to furnish the government with a report on the plant's safety by the end of June.

Thursday, 19 May 2011

'Johor govt welcomes Taiwan to dump factory'

Bakri member of parliament has rapped the Johor state government for its acceptance of a Taiwan-based petrochemical company previously rejected in its home turf over environmental concerns.

"The question is whether the Preliminary Environmental Impact Assessment (PEIA) methodology of our country has lower standards than Taiwan's to the extent that our authorities can accept the project with open arms,” said Er Teck Hua.

Er said that the Taiwanese media had reported that Kuo Kuang Petrochemical would build a factory in Johor following Taiwan president Ma Ying Jeou's refusal to allow it build such a factory there following fears of environmental pollution.

“Before we take a decision whether to support or oppose the investment from Kuo Kuang Petrochemical, we must raise the question on why the Taiwan government itself rejected the plan to build the petrochemical factory in their own soil?" stated Er.

He said a petrochemical factory was known to release dangerous toxics such as dioxin, sulfide and other chemical toxics which can harm the environment and the human’s health.

"Petrochemical industry involves a lot of energy resources, water and the release of nitrogen dioxide which is very high in content,” he added.

Referring to a study by Professor Zhuang Bing Jie from the Environment Engineering Department of National Chung Hsing University, Taiwan, Er said it revealed that the risk of cancer had shot up due to petrochemical plants.

“His research revealed that about 339 to 565 people have died from heart problems, lung cancer and citing an increase in repository diseases,” he said.

Er (left) pointed out that Taiwan's media reported that the Malaysian government was "very keen" to take on the rejected project.

He said a report had quoted International Trade and Industry deputy minister Mukhriz Mahathir as welcoming Kuo Kuang to invest in the country to build oil refineries and naphtha cracking.

“He also said that the (Malaysian) government was ready to offer a conducive environment and fulfil the requirement for the petrochemical industry,” Er said.

He said Pasir Gudang and Pontian local councils had reportedly approved the project despite having no formal application, as claimed by International Trade and Industry Minister Mustapa Mohamed.

According to Er, Taiwan premier Wu Den Yih had on April 23 said he did not rule out the possibility for the industry to be moved to Malaysia.

While Er said petrochemical industry would bring profit, technology transfer and job opportunities, he warned that Malaysia might need to pay the cost of environmental destruction and the health hazards on its citizens.



Wednesday, 18 May 2011

KPOC announces devt plans for Kebabangan gas field

Kebabangan Petroleum Operating Company Sdn Bhd (KPOC) has announced that its shareholders have agreed to develop the Kebabangan (KBB) gas field located offshore Sabah.

KPOC is a joint operating company comprising Petronas Carigali Sdn Bhd (Petronas Carigali) with a 40 per cent stakeholding, together with ConocoPhillips Sabah Gas Ltd (ConocoPhillips) and Shell Energy Asia Ltd (Shell Energy Asia); that each has a stakeholding composition of 30 per cent in the venture.

“The KBB gas field is located in water depths of 100 to 400 metres and is part of the KBB Cluster Production Sharing Contract operated by KPOC. The project will include a 12-well, two-phase drilling campaign as well as the fabrication and installation of an integrated drilling/production platform with living quarters,” KPOC said in a press statement yesterday.

The integrated production platform would be located on the edge of the continental shelf in 140 metres of water, with a design rate of 825 million standard cubic feet per day of gas export capacity, and 80,000 stock tank barrels per day of oil export capacity. Oil and gas would be exported via 135 kilometres of pipelines to the Petronas Carigali – operated Sabah Oil and Gas Terminal (SOGT); currently under construction at Kimanis, Sabah.

“First production is expected at the end of 2014,” added KPOC.

Meanwhile, KPOC’s general manager Kannan Annamalai was enthusiastic on reaching such milestone saying, “The real journey with all its challenges has just begun. Our team is committed to delivering market leading performance in all aspects of the project with relentless focus on safety, quality, cost and schedule,” he remarked.

Tuesday, 17 May 2011

Samsung, Saipem picked for EPC work on Indonesia's Cepu block

US oil major ExxonMobil has picked South Korea's Samsung and Italian construction company Saipem to carry out engineering, procurement and construction work on the Cepu block in East Java, Indonesia, a senior official at Indonesia's upstream regulator, BPMigas, said Tuesday.

The contracts are expected to be inked early May, BPMigas vice chairman Hardiono told Platts.

ExxonMobil could not be reached for comment.

According to Hardiono, Samsung and Saipem will be awarded two of five EPC contracts for the Cepu project. The remaining three contracts will be awarded by May, he said, adding that work on all the contracts should begin by the end of May and be completed by December 2013.

The Samsung-led consortium, which also includes Indonesia's Tripatra Engineering, will be awarded a $750 million contract to build key facilities such as storage tanks and a compressor unit. The Saipem-led consortium will be awarded a $114 million contract to build a pipeline linking the Banyu Urip oil discovery in the block to the northern coast of East Java, and a single buoy mooring facility.

The Cepu oil project took a long time to get off the ground because of protracted negotiations between Indonesia's state-owned Pertamina and ExxonMobil over issues like equity split and operatorship of the block.

The two signed a production sharing contract in September 2005, four years after the block's surprise major oil discovery at Banyu Urip in 2001. Pertamina and ExxonMobil took a 45% stake each in the block, with the local governments sharing the remaining 10% equity.

However, the project has had a rocky start, unable to maximize the 20,000 b/d design capacity of the initial production facilities since it came on stream in December 2008, because of technical problems and issues with evacuating the crude.

Cepu produced an average 18,500 b/d in 2010, according to figures from Indonesia's upstream regulator BPMigas.

The Cepu oil project is estimated to produce 165,000 b/d of crude oil at its peak, according to estimates by ExxonMobil, but this hinges on the award of the EPC contracts to build the necessary infrastructure at the block.

The EPC contracts are for field production and processing facilities, onshore and offshore oil pipelines to the northern coast of East Java, a single buoy mooring facility, and a floating storage and offloading vessel.

ExxonMobil and Pertamina were earlier expected to have awarded the contracts by January this year.

The Cepu block is estimated to contain about 600 million barrels of oil and 1.7 Tcf of gas. Banyu Urip is estimated to contain more than 250 million barrels of oil.

ExxonMobil said Monday that a second oil discovery, named Kedung Keris, was made at the block. The Kedung Keris-1 discovery well was drilled on land to a total depth of 7,032 feet (2,143 meters). The well, which is located approximately 9 miles (14 kilometers) from Banyu Urip, encountered an oil column of 561 feet in the target carbonate zone, it added.

The Kedung Keris-1 well data will be analyzed over the coming months to evaluate the full resource potential of the reservoir, the company said.

Monday, 16 May 2011

Kencana proposes to buy AME for RM400m

Kencana Petroleum Group has proposed to acquire 100% equity interest in Allied Marine and Equipment Sdn Bhd (AME) for RM400mil in its move to become a fully-integrated oil and gas (O&G) player.

Kencana, in its filing with Bursa Malaysia yesterday, said it had executed a conditional sale-and-purchase agreement for the proposed acquisition where it would be satisfied via share swap. Kencana would issue 149.2 million new ordinary shares of 10 sen each in Kencana at an issue price of RM2.68 per share.

The vendors of AME are Worldclass Inspiration Sdn Bhd and Allied Asset Holdings Sdn Bhd.

AME is involved the provision of offshore diving and underwater-related services for inspection, repair and maintenance of structures, pipelines and risers and for the construction of underwater facilities for the O&G industry.

According to Kencana, the proposed acquisition would open the door to gain exposure to a rapidly-growing offshore subsea business in Malaysia and South-East Asia.

“It would provide an opportunity to leverage on AME's customers and to cross-sell services across clients of both group of companies i.e. Kencana Petroleum Group and AME Group.

“Additionally, it will enable Kencana Petroleum Group to recognise in full the earnings stream and cash flows that is expected to be generated by AME and is expected to expand Kencana recurring revenues with higher margins being earned.

“There are also potential cost synergies for Kencana Petroleum Group with the possibility of AME group providing services to Kencana in-house subsea services requirements apart from savings on general and administration overheads,” it said.

For the past three years, apart from Malaysia, AME had also undertaken various projects for multinational oil and gas players in Indonesia, Vietnam, China and India.

The vendors guaranteed to Kencana Petroleum that AME's audited consolidated profit after tax for each of the financial years ending Sept 30, 2011 and Sept 30, 2012 shall not be less than RM40 million.

Sunday, 15 May 2011

Keppel wins US$772m orders for four rigs

Singapore's Keppel Corp said today its unit has got four repeat orders from Oslo-listed S.D. Standard Drilling Plc for jackup oil rigs worth US$772 million (RM2.316 billion).

The deliveries of these units are scheduled between second half of 2013 and first half of 2014, it said in a statement.

The four new orders from Standard Drilling have brought the total value of contracts secured by Keppel Offshore & Marine for the year-to-date to more than S$6.4 billion (US$5.1 billion). — Reuters

Dialog denies bagging Petronas oilfield job

Dialog Group Bhd said it was still bidding with potential Australian partner Roc Oil Co Ltd for contracts pertaining to Petroliam Nasional Bhd's (Petronas) marginal oilfield developments.

The company told Bursa Malaysia yesterday that Roc Oil was its business partner and was presently tendering for upstream oil and gas prospects in Malaysia with the possibility of a joint venture between the two companies if the tender was successful.

“To date, Dialog and Roc Oil are still in the bidding process and have not entered into a joint-venture agreement and neither parties have received any letter of intent for marginal oilfield projects from Petronas,” it said.

The company was responding to a business daily report citing sources that both parties were on the verge of bagging marginal oilfield projects under the risk-service contract (RSC) model from Petronas for Balai and Bentara, located off the coast of Sarawak.

It was reported by other international publications that the parties had received a letter of intent for the cluster development of the two fields which involved four wellhead platforms plus a floating storage offloading or a floating production, storage and off-loading vessel.

Maybank Investment Research said in a report yesterday that if the RSC materialised, it would mark Roc Oil's Malaysian debut and Dialog's first upstream oil and gas venture.

“Bentara is located in Block SK-6, previously operated by Occidental Petroleum, while Balai is near to Bentara. Bentara discovery well flowed 1,200 barrels per day of oil and 9.8 mmscfd (million standard cubic feet per day) of gas during a well test,” it said.

The brokerage added that it was positive on the development and reckoned that Dialog would provide mercury extraction/handling services for these fields.

To re-cap, the first RSC was awarded by Petronas in February to a consortium formed by Kencana Petroleum Bhd and SapuraCrest Petroleum Bhd, together with Petrofac Energy Developments Sdn Bhd, for the development and production of Berantai marginal oil field, located 150km offshore Terengganu.

The US$800mil RSC to be handled by the three partners is for a nine-year period starting Jan 31. The project is targeting its first gas by the end of this year, with the first development phase of 18 wells expected to be completed by end-2012.

Saturday, 14 May 2011

IAEA names Lynas refinery review panel

The UN’s International Atomic Energy Agency (IAEA) today unveiled the team that will conduct an evaluation of the controversial RM700 million rare earths refinery in Gebeng, Pahang — a review necessitated by mounting opposition from surrounding residents and environmentalist groups.

Malaysia had earlier asked the Vienna-based agency for assistance in addressing public concerns about the project by forming a panel to review radiation health and safety factors.

The panel will be headed by Dr Tero Varjoranta, the IAEA’s director of the Nuclear Fuel Cycle and Waste Technology at its Nuclear Energy department.

Other members of the panel include Dr Magnus Vesterlind, Dr Horst Monken Fernandes, and Hanna Kajander — all of whom are attached to the nuclear agency.

Asides from its own personnel, the IAEA panel will also include outside experts Jan van der Steen, Dr Leo M. Lowe, Dr PM Balagopala Pillai, Dr Dennis Wymer and Ulric Schwela.

The multinational panel was announced today by Minister of International Trade and Industry Datuk Seri Mustapa Mohamed, who also pledged that the government will reveal the panel’s finding in its entirety upon completion.

The review was initiated by the government to alleviate growing public pressure to scrap the Lynas Corp plant as environmental activists say it could make Malaysia a dumping ground for radioactive by-products from the refining process, creating health risks.

Lynas has said it does not foresee problems with the month-long review and expects to be able to keep its scheduled September opening of its facility.

Public health concerns over the Lynas plant were exacerbated by Malaysia’s previous dalliance with rare earth minerals in Bukit Merah, Perak.

The Asian Rare Earth (ARE) plant in Perak has been linked to birth defects and at least eight cases of leukaemia in the past five years, seven of which were fatal.

Nearly 20 years after it was shuttered, the plant is still the subject of a massive RM300 million cleanup exercise.

Lynas’s Gebeng plant was supposed to process rare earth concentrate shipped in from the firm’s Mount Weld site in western Australia.

Rare earths are crucial to production of high-tech goods from fibre optic cables to smartphones and electric cars.

Company officials have said annual output from the Malaysian plant would hit 22,000 tonnes, meeting roughly a third of total global demand outside China by 2013.

Pertamina Said to Consider Swapping Natuna for Angola Oil Stake

PT Pertamina may swap its share in Indonesia’s biggest gas field to help fund a bid for Exxon Mobil Corp. (XOM)’s stake in an Angola oil block, an official at the Jakarta-based energy company said.

Pertamina is the preferred bidder for Exxon’s 25 percent share and is in talks with Cnooc Ltd. (883) on a possible joint bid to help fund the deal, said the official who declined to be identified as the negotiations are private. The Indonesian national oil company may swap its stake in the East Natuna field with Exxon as part of the transaction, and had sent a team to Beijing last week for talks with Cnooc, the person said.

Indonesia, Southeast Asia’s largest economy, is seeking overseas oil assets after a drop in domestic production led to its exit from OPEC in 2008. Pertamina bid about $3.5 billion for Exxon’s stake, the Wall Street Journal reported yesterday, citing a person with knowledge of the matter.

“We’re continuing talks to jointly develop oil blocks abroad, including cooperation with Cnooc in Angola,” Mochamad Harun, vice president for corporate communications at Pertamina, said by telephone from Jakarta, declining to specify the value of the bid. “We’re also talking with national oil companies for joint development of oil blocks abroad.”

Jiang Yongzhi, the Beijing-based spokesman at Cnooc, declined to comment when asked if the company is in talks with Pertamina on a possible joint bid in Angola.

Biggest Acquisition

The purchase of Exxon’s stake in the Angolan block would eclipse PT Berlian Laju Tanker’s $850 million purchase of Chembulk Tankers in 2007 as the largest overseas acquisition by an Indonesian company.

“It’s a good strategy by Pertamina to bring in Cnooc for the Angola bid,” Kurtubi, founder of the Jakarta-based Center of Petroleum and Energy Economics, said by telephone. “Cnooc has a strong capital base and is a well-known energy company,” and the move will help Indonesia secure crude supplies for domestic refineries, said Kurtubi, who goes by one name.

Crude output dropped 2.5 percent to 769,068 barrels a day in April from March, the nation’s oil and gas regulator BPMigas said on May 3. Angola, which vies with Nigeria as Africa’s top oil producer, pumped 1.625 million barrels a day last month.

Indonesia produced 957,000 barrels of oil a day last year, missing its target of 965,000 barrels. The government expects output to reach 952,000 barrels a day this year.

Indonesian Gas Field

The Indonesian government has selected Pertamina, Exxon, Total SA (FP) and Malaysia’s Petroliam Nasional Bhd. to jointly develop East Natuna, estimated to hold 40 percent of the country’s natural gas reserves. The companies may reach a production-sharing agreement in the first half of 2011, Evita Legowo, director general of oil and gas at the Energy and Mineral Resources Ministry, said on Dec. 17.

The field off Borneo’s western coast was discovered in 1973 and Exxon was granted a license to explore for gas seven years later. In 2006, Indonesia revoked the license, saying the U.S. company had failed to provide a feasibility study. Exxon, which had held a 76 percent stake, denied the claim.

Pertamina wants to hold the majority stake in East Natuna and be its operator, Ferederick Siahaan, the company’s former investment planning director, said in December.

East Natuna, previously called Natuna D-Alpha, is estimated by Pertamina to hold 46 trillion cubic feet of gas. That compares with the 112.5 trillion cubic feet of reserves held by Indonesia as of the end of 2009, according to BP Plc (BP/)’s Statistical Review of World Energy.

Friday, 13 May 2011

Saipem has been awarded new offshore pipeline engineering and construction contracts in China and Brazil.

In China, Husky Oil China has awarded Saipem a contract for the Liwan 3-1 Field – Deepwater, which is located in Block 29/26, approximately 300 km south of Hong Kong in water depths of 1,500 m. It represents the first offshore field developed in deep water in the South China Sea.

The scope of work includes the engineering, procurement, construction and installation of two 79 km, 22 inch diameter pipelines and umbilicals, as well as the transport and installation of a subsea production system linking the wellheads to a processing platform.

In Brazil, Petrobras has awarded Saipem a contract for the Guara and Lula-Northeast gas export pipelines in the Santos Basin, approximately 260 km off the coasts of Rio de Janeiro and São Paulo, in water depths of between 2,100 and 2,200 m.

The contract encompasses the transportation, installation and pre-commissioning of two export sealines, as well as the engineering, procurement and construction of related subsea equipment.

The 54 km, 18 inch diameter first line will connect the Guara floating production storage and offloading (FPSO) vessel to a subsea gathering manifold in the Lula field. The 22 km, 18 inch diameter second line will connect the Lula-Northeast FPSO to the same manifold in the Lula field.

The offshore activities for both the contracts will be performed mainly by the newly-built and highly specialised Saipem FDS 2 vessel in different periods between 2012 and 2013.