Wednesday, 8 June 2011

Opec divided as Saudi pushes for oil increase

Saudi Arabia faced stiff resistance today from Opec producers opposed to an increase in oil supplies that help ease crude prices.

Under pressure from consumer countries to contain fuel inflation, Saudi Arabia hopes to push the Organisation of Petroleum Exporting Countries to lift its production target by 1.5 million barrels a day at a meeting today, Gulf delegates said.

Riyadh has support from its Gulf Arab allies Kuwait and the United Arab Emirates to meet rising demand in the second half of the year.

“There is a need for more supply in the market,” Kuwait’s Oil Minister Mohammad al-Busairi told Reuters. “I expect demand to be strong in the third and fourth quarter.”

As Opec’s biggest producer and the only one with any significant spare capacity, Saudi usually gets its way.

But four countries — long-time price hawks Iran and Venezuela plus Ecuador and Iraq — have said publicly they see no need to increase output. All want to keep oil prices above US$100 (RM300) a barrel. Brent crude traded at US$116 a barrel today.

“We do not agree with production being increased now, we must continue to consolidate balance in the market and we have to defend fair prices,” Venezuelan President Hugo Chavez said on Tuesday in Ecuador.

Iran is represented by caretaker oil minister Mohammad Aliabadi, a close ally of President Mahmoud Ahmadinejad and is expected to take a tough line against an increase.

At a minimum, Gulf producers want to close the 1.4 million bpd gap between Opec’s two-and-a-half year old official production limit of 24.8 million bpd and actual output, estimated by Opec in April at 26.2 million.

Beyond that, it will be up to Saudi Arabia to deliver more oil.

Regardless of the policy decision, Riyadh will pump more.

A Gulf official said Saudi was planning to up outut by at least 500,000 bpd in June to 9.5-9.7 million bpd.

Saudi output was last as high in the middle of 2008 after oil prices set a record US$147 a barrel, shortly before recession sent prices crashing.

Backing the Gulf producers are Nigeria and Algeria who sit on a committee that has recommended a one-million-bpd increment.

The numbers suggest more oil is required to stop oil prices rising again.

Opec’s Vienna secretariat is forecasting that demand in the second half of the year will be 1.7 million bpd higher than current cartel output. — Reuters

Monday, 6 June 2011

Malaysia to attract oilfield services players

Malaysia hopes to attract 10 to 20 major international companies in the oilfield services and equipment (OFSE) industry to bring about 10% of their business operations here.

“This could translate to around 40% of their regional activities and would mean positioning Malaysia as a cost-competitive base for engineering, procurement and construction as well as a strategic base for installation activities in the Asia-Pacific region,” said Deputy Prime Minister Tan Sri Muhyiddin Yassin in his key note address at the Oil and Gas Asia 2011 conference yesterday.

“To achieve such lofty ambitions, we are fully aware that there is a need for a one-stop government body with sufficiently deep industry knowledge and expertise that focuses on coordinating and promoting the Malaysia OFSE industry,” he said.

The deputy prime minister said the one-stop government body, the Malaysia Petroleum Resource Corp (MPRC), will look into creating an attractive business environment for multinational companies by ensuring administrative ease for the OFSE industry and promote the local OFSE industry abroad.

The establishment of MPRC was mooted by the Performance Management and Delivery Unit (Pemandu) in the Prime Minister’s Department. Details of the corporation have yet to be announced.

Muhyiddin said there are a significant number of business opportunities in the oil, gas and energy sector in Malaysia because the country’s offshore producing fields are more mature than those of its neighbours.

“There will be tremendous commercial opportunities for maintenance and replacement of assets in addition to development of new fields, which will continue to drive growth in this key sector,” he said.

The global OFSE market is valued at RM800 billion, he said, with growth of 25% a year in recent years. The Asian market for oil services alone has grown by about 20% annually over the last decade.

“The sector outlook continues to be bright, driven by the upbeat outlook for offshore exploration activity in Southeast Asia, tight gas development across Asia and the liquefied natural gas (LNG) boom in Australia,” he said.

Sunday, 5 June 2011

SapuraCrest stomping the yard in Labuan

SapuraCrest announced that it has signed an agreement with Realmild Sdn Bhd and Labuan Shipyard & Engineering Sdn Bhd (LSE) to subscribe to a 50% stake in LSE. The yard is sited on 13ha of land within the port of Victoria Harbour in Labuan with deepwater access. Its annual capacity is 36,000 tonnes.

Although it is positive, the announcement did not come as a surprise. In an update on Oct 21, 2010, following our US roadshow with management, we wrote that mergers and acqusitions might be on the cards and that a venture into the oil and gas fabrication segment would make the most commercial sense, especially if the company plans to add new drilling rigs and/or pipelay barges to its fleet. All the existing rigs and barges were built by fabricators in Europe and Asia.

We take a favourable view of the acquisition as it could help expand SapuraCrest’s local and regional presence and fast-track its bottom line growth. We are also encouraged that the new business is oil and gas-related and involves a promising segment that SapuraCrest does not have exposure to. The company currently operates in the drilling, installation of pipelines and facilities and marine services segments.

SapuraCrest paid RM25 million for the 50% stake in LSE, which we understand has broken even following a rough patch in recent years. The remaining 50% stake is held by Umno-linked Realmild, which had been leasing the yard from the Ministry of Finance (MoF) for a reported RM7 million per year. We believe SapuraCrest and Realmild will now jointly lease the yard from the MoF. We understand that LSE has a modest order book of around RM250 million, which SapuraCrest hopes to expand over the next 12 months. Already, Petra Energy Bhd has indicated its interest in using the yard’s facility for minor fabrication works. Petra Energy and LSE were to sign the agreement yesterday at the 13th Asian Oil, Gas and Petrochemical Engineering Exhibition at the Kuala Lumpur Convention Centre. Petra Energy executive director and CEO Kamarul Baharin Albakri was quoted as saying that the yard was selected for its strategic location and proximity to oil production facilities in Sabah.

SapuraCrest’s move into fabrication is not a threat to Kencana Petroleum Bhd, which operates a fully-equipped yard in Lumut. Given the low level of activities at the LSE yard in recent years, SapuraCrest’s management expects the yard to be fully developed in three years. With its 13ha yard and RM250 million jobs in hand, LSE is currently not batting in the same league as Kencana, which has a yard sprawling 89ha and an order book of RM1.5 billion.

Pending substantial new orders at the LSE yard, we maintain our forecasts and target price of RM5.12. We continue to value SapuraCrest at a 40% premium over our 14.5 times target market price-earnings ratio given its marginal field venture and superior growth. The stock remains an “outperform” and our top oil and gas pick in view of the potential catalysts of this new venture, more marginal field work and fleet expansion.

On Jan 31, a consortium comprising Petrofac (Malaysia) Sdn Bhd (50%), SapuraCrest (25%) and Kencana (25%) secured the nine-year, US$800 million (RM2.4 billion) Berantai marginal field contract. SapuraCrest’s transport and installation works are being executed as scheduled, helped by its in-house pipelay barges. Results for 1HFY12 should include a maiden contribution from the project.

Saturday, 4 June 2011

Lundin Petroleum farms-in to Malaysian Petronas oil block

Lundin Petroleum says its Malaysian subsidiary has entered an agreement with Petronas Carigali Sdn to acquire a 75 per cent interest in an offshore oil block.

The company also says it will operate the Block PM307 offshore Peninsula Malaysia.
Petronas would hold the remaining 25 per cent interest in the Block.

Lundin says the block covers an area of just over 6,000 square kilometres and contains a proven oil discovery.

Lundin Petroleum now operates a total of 6 Blocks in Malaysia divided into 2 core areas.

Company president Ashley Heppnstall says the agreement is an important step forward in Lundin Petroleum's pursuit of "organic growth opportunities in Malaysia and South East Asia."

Lundin Petroleum is a Swedish independent oil and gas exploration and production company with assets in Europe, South East Asia, Russia and Africa.

Friday, 3 June 2011

Chevron says four killed in UK refinery explosion

Oil major Chevron said on Friday that four people were killed and one person was seriously injured in an explosion at its refinery in southwest Wales.

The blast occurred at the 220,000 barrel per day Pembroke refinery on Thursday. Chevron did not provide any details on the operational status of the refinery.

Police said a fire broke out after an explosion in a storage tank during maintenance. An adjacent storage tank was also damaged.

"We will take every step possible to determine the series of events that led to this tragic incident," Chevron said.

Chevron put the refinery up for sale last year to lower its exposure to the refining business.

U.S. refiner Valero Energy Corp agreed in March to buy the refinery and other assets in a $730 million deal expected to close in the third quarter.

Petronas Buys Stake in Canada Gas Fields

Petronas, agreed to pay as much as C$1.07 billion ($1.1 billion) for a stake in Progress Energy Resources Corp. (PRQ)’s British Columbia natural-gas fields. The companies will also form a joint venture to explore exporting the fuel.

Petronas will pay C$267.5 million for a 50 percent share in the Altares, Lily and Kahta fields in the Montney Shale region, Calgary-based Progress said in a statement today. The Malaysian company also will fund 75 percent of development costs for the fields during the next five years, up to $C802.5 million.

“The Montney is a very good asset and this looks like a strategic move to build up a large export facility,” said Kim Page, an analyst at Wellington West Capital Markets Inc. in Toronto who has a “buy” rating on Progress and owns shares. “The price seems a little richer than recent deals, but these assets also have a higher liquid content.”

Petronas, based in Kuala Lumpur, will own 80 percent of a joint venture that will study the feasibility of building a terminal in British Columbia to export gas by tanker, Progress said. Shipping the fuel by tanker would allow exports to Asia and other markets not accessible by Canadian pipelines. Apache Corp., the Houston-based owner of gas fields in the province’s Horn River basin, has proposed a similar terminal near Kitimat, British Columbia.

Progress rose to a 52-week high, gaining as much as 12 percent, the most in 20 months. The shares rose 91 cents, or 6.5 percent, to C$14.89 at 10:37 a.m. on the Toronto Stock Exchange.

“This is a breakthrough for Progress,” Chief Executive Officer Michael R. Culbert said in the statement. “Canada is poised to take a larger role on the world’s energy stage. Developing export options for Canadian natural-gas producers is a logical step.”

The Montney Shale, which lies beneath British Columbia and Alberta, holds an estimated 49 trillion cubic feet of gas, according to an April 5 report by the U.S. Energy Information Administration. Producers inject water, sand and chemicals into shale, a dense rock formation, to extract gas.

Thursday, 2 June 2011

BP finalizes study for new LNG train

Oil and gas giant BP is waiting for certainty over its gas reserves to go ahead with its plan to build a third liquefied natural gas (LNG) train at the Tangguh LNG plant in Papua, upstream oil and gas regulator BPMigas said.

“The company is currently in the final phase of studying the reserves at the Tangguh gas field to check whether it can supply gas to the planned train,” BPMigas spokesperson Gde Pradnyana told reporters via text message on Monday.

He continued that the construction of the train could only be started after the company ensured that the gas reserves would be sufficient to supply the planned train and there were certain purchasing contracts with buyers.

The planned train will have a total production capacity of 3.8 million tons per annum.

Tangguh is a massive gas project located in the Bintuni Bay area in West Papua with total proven gas reserves of 14.4 trillion cubic feet.

The Tangguh LNG plant consists of two production units, each with capacity of 3.8 million tons of LNG per year.

BP started the first production unit, Train 1, in February 2009 and the second, Train 2, in July 2009.

BP is the operator of the Tangguh field, holding a 37.16 percent stake in the project. Other partners are MI Berau B.V. (16.3 percent), China-based CNOOC (13.9 percent), Nippon Oil Exploration (Berau) (12.23 percent), KG Berau/KG Wiriagar (10 percent), LNG Japan Corporation (7.35 percent) and Australia-based Talisman (3.06 percent).

BPMigas says that the Tangguh gas field has been the fourth largest contributor to national gas production. The agency expects the field will produce 879.57 million standard cubic feet per day (mmscfd) in 2011, up from the previous target of 859.16 mmscfd.

BP announced that it will invest around US$10 billion over the next ten years to crank up production at the Tangguh LNG plant and explore the country’s coal-bed methane (CBM) potentials, according to a report from Bloomberg.

BP chief executive officer Bob Dudley affirmed his company’s commitment to continuously
invest in Indonesia after meeting with President Susilo Bambang Yudhoyono and Energy and Mineral Resources Minister Darwin Zahedy Saleh on Friday.

“Our focus in investment is Tangguh in Papua, which we know we handle with great care as that’s already a very large project for BP,” he said.

The company, which has operated in Indonesia for more than 35 years, reported that as of today, it has invested around $7 billion.

Dudley said that the company would develop CBM blocks in Kalimantan. The company had signed four CBM production sharing contracts (PSC) in the Barito basin.

The $5 billion Tangguh project, which shipped its first LNG cargoes in 2009, has multi-year contracts to supply 2.6 million tons a year to China, 1.15 million tons a year to South Korea and an agreement to supply as much as 3.7 million tons a year to Sempra Energy, Bloomberg says.

Indonesia is currently the world’s third largest LNG exporter after Qatar and Malaysia.

Wednesday, 1 June 2011

New acquisitions to spur consolidation for MMHE’s growth

The recent signing of the memorandum of understanding (MOU) between Malaysia Marine and Heavy Engineering Holdings Bhd (MMHE) and Sime Darby Engineering (Sime Darby) puts MMHE on an optimistic growth track.

To recap, MMHE entered into a MOU with Sime Darby for the proposed acquisition of a 130 acres fabrication yard in Pasir Gudang, Johor at a provisional price of RM399 million to be satisfied entirely in cash.

On a separate note, Petronas also entered into an MOU with Sime Darby to acquire the 170 acres fabrication yard in Teluk Ramunia for a cash consideration of RM296 million.

According to the research arm of Kenanga Investment Bhd (Kenanga Research) the overall acquisition and its combined purchase price of RM695 million for both Pasir Gudang and Teluk Ramunia was fair. The overall 300 acres of yard space translated into an attractive price of RM2.3 million per acre.

OSK Research Sdn Bhd (OSK Research) in its research noted yesterday that the acquisition of these projects were well within expectations as Petronas had plans to consolidate the fabricators, be it their yards or their licences.

The research house expected this acquisition by MMHE to materialise as the company had strong orders but lacked sufficient yard space to perform its fabrication jobs due to its existing high utilisation rate of above 80 per cent.

In addition to that, the acquisitions were part of Petronas’s initiatives to encourage the local boys to grow bigger in order for them to compete in the international arena.

Kenanga Research noted that MMHE is currently in a strong net cash position of RM1.45 billion and thus, the purchase of new yard spaces would instantly boost its total annual tonnage capacity to 130,000 metric tonnes (mts).

The research house further added that more importantly, the newly added capacity presented instant enlarged capacity to take on higher tonnage projects from both domestic and regional. This could be done without having to wait for its yard optimisation programme to complete in 2014.

“We believe the strategic acquisition is timely as it prepares to take on two large domestic contracts which are the Tapis rejuvenation and Malikai deepwater platform,” the research firm said.As for Petronas’ acquisition of the Teluk Ramunia yard, OSK Research concluded that this acquisition was to provide additional resources to support ancillary infrastructure in line with its initiatives for the greater southern Johor development.

“In our view, having Teluk Ramunia would provide the company with additional land for its Pengerang project. In fact, we understand that the distance between the yard and project site is only about 20 kilometres,” OSK Research highlighted.

Although satisfactory due diligence was required before the acquisitions could go through, analysts at OSK Research did not see this process failing. Furthermore, analysts believed that these acquisitions could well had been part of the company’s plans in the earlier days since its existing utilisation rate had exceeded 80 per cent.

Therefore, the research house factored in some of MMHE’s new jobs into its financial year 2012 (FY12) forecast. These projects included a portion of the RM1.15 billion contract to construct the KBB Topsides for the Kebabangan Northern Hub Development Project, which was awarded to Sime Darby in April 2011.

Hence, OSK Research upgraded the FY12 earnings by 14 per cent. The research house pegged MMHE at a fair value of RM8.23 based on the existing price earnings ratio (PER) of 25 times FY12 earnings per share (EPS) following the FY12 earnings upgrade.

Kenanga Research on the other hand pegged MMHE at an upgraded target price of RM7.90 as analysts had rolled over its valuation to FY12 basis, based on an EPS of 31.6 sen and a PER of 25 times.

Tuesday, 31 May 2011

Demand From China, India And Asia Pacific To Continue For Petronas Chemical Group products

Petronas Chemicals Group Bhd (PCG), the leading integrated petrochemicals producer in Malaysia, is expected to see continued demand for its products from China, India and the Asia Pacific.

PCG produces a diversified range of petrochemical products from its olefins and derivatives segment as well as fertilisers and methanol.

In a research note today, OSK Research said PCG's utilisation rate for both segments stood at 86 per cent and 82 per cent respectively, for the fourth quarter of financial year 2011.

Thus, it added, the PCG management is targeting for the utilisation rate of its plants to hit 90 per cent.

OSK said in addition, PCG also expects the feasibility study on its Refinery and Petrochemical Integrated Development Project to be completed by year-end.

The research house has maintained a "buy" call on PCG's stocks at RM9.28. -- Bernama

Monday, 30 May 2011

Government expects 40pc of total investment from oil and gas

The government has projected the oil and gas sector to continue supplying over 40 per cent of total investments until 2020.

Minister of International Trade and Industry Datuk Seri Mustapa Mohamed said today that the sector is projected to invest at least two-fifths of the RM1.33 trillion targeted under the Economic Transformation Programme (ETP).

“Oil and gas has been contributing about 42 per cent each year, so it is on track,” he told reporters.

The ETP, launched by Prime Minister Datuk Seri Najib Razak in September 2010, plans to push the country to reach developed nation status by 2020.

This will include raising per capita income from US$6,700 (RM20,400) per year to US$15,000 and total gross national income to US$523 billion.

Putrajaya has set an annual target of six per cent economic growth to achieve this target.

Mustapa also said today that total investment for 2011 was RM83 billion, with an average of RM115 billion per year targeted for the next five years.